Projects

Cichon Road

Geothermal Industries installed 8 geothermal bore holes to a depth of 100m each as the source of energy for a residential home in South Australia Geothermal Industries was proud

Annangrove Road

Geothermal Industries installed 3 geothermal bore holes to a depth of 100m each as the source of energy for a residential home in NSW Geothermal Industries was proud to

Roc-Drill Head Office

Geothermal Industries used the site for Roc Drill s head office in Toowoomba QLD to showcase it s abilities and to bring awareness to the industry and geothermal technology

Sydney Science Park

Geothermal Industries was selected to drill a Thermal Conductivity Test well to 100m on the site of the future development The test well drilling was completed in one day

Trinity College

Geothermal Industries was selected to drill a Thermal Conductivity Test well to 100m on the campus grounds at Trinity College in North Melbourne

Plumbing Industry Climate Action Centre

Geothermal Industries was involved in the early stages of the project and was selected to initially drill a test hole to 100m on the site for a Thermal Conductivity

Healthways Aquatic Centre

Geothermal Industries was selected to install 12 Vertical Geothermal Bores to a depth of 100m Healthways is located within a residential area of Box Hill in Victoria and services

Riversdale Master Plan

Geothermal Industries was involved in the early stages of the project and was selected to drill a completed Vertical Ground Heat Exchanger with the inclusion of a test hole

Darling Point

Darling Point is a classic example of a situation where if geothermal can work on this site it can work anywhere The drill site was only accessible by barge
Scroll to Top