Ingenia Communities Club House, Fullerton Cove

Geothermal Industries Australia (GIA) was engaged to deliver the geothermal drilling scope for an Ingenia Communities aged care facility in Fullerton Cove, NSW. The project required drilling 16 geothermal probes to a depth of 110 metres each on a greenfield site in the Hunter region. As part of Ingenia’s commitment to sustainable, low‑carbon residential communities, […]
Elanora Heights, Northern Beaches

Geothermal Industries Australia (GIA) was engaged to deliver the geothermal drilling scope for a residential project in Elanora Heights, on Sydney’s Northern Beaches. The project required drilling six geothermal probes to a depth of 120 metres each on a site characterised by the challenging geological conditions typical of the region. Elanora Heights sits atop complex […]
Double Bay Apartments

Geothermal Industries Australia (GIA) was engaged to deliver the geothermal drilling scope for a premium commercial apartment development in Double Bay, NSW. The project required drilling 20 geothermal probes to a depth of 135 metres each on a tightly constrained urban site in one of Sydney’s most prestigious eastern suburbs. Double Bay’s combination of heritage […]
Cronulla

Geothermal Industries Australia (GIA) was engaged to deliver the geothermal drilling scope for a challenging multi‑level residential project in Cronulla, NSW. The project required drilling 15 geothermal probes to a depth of 135 metres each on a difficult 5‑level site with severely constrained access. Due to the building’s height and the absence of ground‑level entry […]
Burraneer

Geothermal Industries Australia (GIA) was engaged by a residential plumbing contractor to deliver the geothermal drilling scope for a substantial residential project in Burraneer, NSW. The project required drilling 18 geothermal probes to a depth of 135 metres each on a notoriously tough site. Burraneer’s coastal geology presented significant challenges, including shallow sandstone, clay lenses, and […]
Parliament of Victoria

Geothermal Industries was proud to be selected for the drilling of 56 Geothermal bores to a depth of 100m below grade on this high profile commercial project. The drilling occurred in the base of the excavation prior to the basement slabs being poured. By having the geothermal drilling occur under the existing building footprint it […]
Plumbing Industry Climate Action Centre

Project Overview The Plumbing Industry Climate Action Centre (PICAC) at Narre Warren was designed as a state-of-the-art training facility and demonstration centre for clean energy technologies. From the outset, it was identified that a geothermal system would provide not only substantial sustainability benefits, but also serve as an invaluable teaching tool for thousands of apprentices, […]
Australian War Memorial

Geothermal Industries is proud to have delivered Australia’s largest closed-loop underground geothermal heating and cooling system at the Australian War Memorial, as part of its landmark development and expansion program. This pioneering project represents a national first and sets a benchmark for sustainable infrastructure. Minister for Climate Change and Energy, Chris Bowen, welcomed the initiative: […]